Montpelier renovation...

This project is an interesting one. I would describe it as a collaboration between us (the builders), the designer, the homeowner, two painters and a heating systems company. The job has many aspects to it. After a structural assessment we addressed a few support issues in the basement with new footers and posts. We replaced a number of large double hung windows in terrible shape with new Marvin full replacements. We duplicated the historic trim inside and out and one painter did a fantastic job matching the trim to the old mahogany. We have performed numerous floor patches to match the old floor as the old radiators have been replaced. The new heating system is a Pellergy boiler with Runtal low temp panels that operate at 140 degrees. The heating project has been mostly the brainchild of the homeowner and heating company and will also include solar panels. We have altered closets and walls. The project also includes a full kitchen remodel.